May 20, 2017
“We had an emergency outage due to a 35KV cable failure on Saturday. AEC was able to promptly dispatch a test technician to identify the fault location. Thanks to their test equipment availability they were also able to perform a VLF and partial discharge test on two similar cable runs.”