May 20, 2017
“Our data center maintenance shut down required extensive temporary back feed to the mission critical loads. This was the first time that we fully tested all the back-up power systems since we took over the existing data center facilities. To our surprise AEC discovered a significant deficiency in one of the generators paralleling transfer schemes. The engineering department of AEC provided a quick solution and allowed for a successful shut down.”